Servicio

Cloud infrastructure

On-premise, VMware, Proxmox, AWS, Azure or Google Cloud. We design, migrate and run the architecture that fits your real workload and budget.

We design, migrate and run infrastructure in the cloud, in your server room or in a hybrid model. No dogma: we choose according to your workload, your budget and your legal obligations, not according to what suits us to sell.

What we work on

Virtualisation

VMware vSphere and Proxmox VE. High-availability clusters, shared storage and live migration.

Public cloud

AWS, Microsoft Azure and Google Cloud. Sizing, reserved instances and monthly spend control.

Hybrid and migrations

We move workloads between on-premise and cloud without interrupting the service, with a planned window and a rollback plan.

What it includes

  • Real sizing: you pay for what you use, not for what you keep “just in case”
  • High availability and tolerance to node failure
  • Backups built in from day one
  • Architecture documentation delivered and kept up to date
  • Cost control with alerts when spending drifts
  • Guaranteed way out: you never get locked into our provider

The stack we work with

HypervisorsVMware vSphere · Proxmox VE · Hyper-V
Public cloudAWS · Microsoft Azure · Google Cloud
StorageiSCSI · NFS · Ceph · Synology · QNAP
Operating systemsWindows Server · Debian · Ubuntu · Rocky Linux
ContainersDocker · Docker Compose · Portainer

“The hardest part for us was deciding. They turned up with three options, with numbers, and told us which one they would have chosen and why.”

Finance director · distribution company, Alicante

Frequently asked questions

Everything to the cloud, or better to keep our own servers?
It depends. Steady, predictable workloads usually work out cheaper on-premise; peaks, test environments and the need to grow fast fit better in the cloud. The usual answer is a hybrid, and that is what we tend to propose.
How long does a migration take?
An SME with 3-5 servers is normally migrated in 4-8 weeks including testing. The real cut-over window is planned for a weekend and rarely runs beyond a few hours.
What happens if something goes wrong during the migration?
Every migration comes with a documented and tested rollback plan. We don’t switch off the source until the destination has been validated.

Shall we look at your specific case?

30 minutes with an engineer, no strings attached. We will tell you what we would improve and what we would leave alone.