What it involves
Design and installation of network cabling, rack build and tidy-up, patch panels, trunking and outlets. Every patch lead labelled at both ends and every outlet certified with test equipment, with the certification report handed over. We also leave you the plan of which outlet goes to which point: that is what turns a two-day fault into a ten-minute one.





